EVERSAFE

Everyday Safety for Electric Vehicles

Joint project
Duration of the specified sub-projects
01/05/2012 - 30/09/2014
Project management
FhG • EMI
City
no information
Project participants
k. A.
Amount of funding of the specified sub-projects
320.850,00 €
Total budget of the specified sub-projects
320.850,00 €
Sponsor
BMV
Description of the content of the joint project
Remark: The information does not necessarily refer to the entire collaborative project, but only to all sub-projects that are related to secondary secondary electrochemical energy storage systems.
Detailed description
Challenges and goals

Im Fokus des Forschungsprojekts EVERSAFE stand die passive Fahrzeugsicherheit von E-Autos. Beteiligt waren das Fraunhofer-Institut für Kurzzeitdynamik (EMI), das Fraunhofer ICT, das schwedische Forschungsinstitut für Verkehr und Transportwesen (VTI), die Bundesanstalt für Straßenwesen (BASt) und die Volvo Car Corporation (VCC).

Die Forschungsthemen dynamische Fahrstabilität, Batteriesicherheit und das Verhalten von EVs während und nach schweren Verkehrsunfällen wurden in zwei Teilprojekten bearbeitet. Zudem wurden eine Literaturrecherche sowie zwei Fokusgruppen zur Nutzerbewertung von EV-Sicherheit durchgeführt. Verschiedene Nutzerbedenken hinsichtlich des Fahrens, Ladens, bei Unfällen und der Alterung von Komponenten des EVs wurden für erfahrene und unerfahrene Nutzergruppen identifiziert.

Quelle: https://www.emi.fraunhofer.de/de/geschaeftsfelder/automotive/forschung/archiv/neue-autos-_-neue-crashtests--eversafe.html (jüngster Zugriff: 30.07.2024)

Remark: The information does not necessarily refer to the entire collaborative project, but only to all sub-projects that are related to secondary secondary electrochemical energy storage systems.
Project partners
Sub-project 2
Duration:

01/05/2012 - 30/09/2014

Funding code:

03EMEN01B

Executing unit

Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e. V.

Fraunhofer-Institut für Kurzzeitdynamik – Ernst-Mach-Institut

Ernst-Zermelo-Str. 4

79104 Freiburg

DE

to the Website
Funding

Sponsor:

Bundesministerium für Verkehr und digitale Infrastruktur
Referat G23: Elektromobilität, Ladeinfrastruktur

Project management agency (governmental):

Projektträger Jülich
Arbeitseinheit EVI2: Elektromobilität und Verkehrskonzepte

Profile of funding:

Technologie- und Innovationsförderung

Type of funding:

PDIR

Systematic nature of the performance plan:

Alternative Antriebstechnologien

The following is a summary of terms used to describe the work in the joint project (i.e. the work of all sub-projects).
Remark: The information does not necessarily refer to the entire collaborative project, but only to all sub-projects that are related to secondary secondary electrochemical energy storage systems.
Joint-project management

not specified

Joint-project coordinator

not specified

Links
  • Joint project
  • to the website of the joint project
    Final reports and other publications at the TIB - Leibniz Information Centre for Science and Technology and University Library
      Final reports and other publications on the funding code "03EMEN01B"
    • Map view
      • Organizations
      • Projects
      • Infrastructure
    • Links
      • More Projects
      • Participation
      • About us
      • Privacy policy
      • Imprint