Linie zur Fertigung von LIB-Zellen u. ä. Zelltypen

Location | 85748 Garching b. München Bayern |
Opened | 08.2024 |
Boltzmannstr. 15
85748 Garching b. München
DE
| Technology Readiness Level | Electrode processing | Cell assembly and cycling | |||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Producible types of batteries (cell chemistry) | TRL from | TRL to | Electrode materials and electrolytes | Type of electrode processing | Max. mass of coatings per Day (8h) (kg/d) | Max. coating width (mm) | Calander roll width (mm) | Coating speed (m/min) | Dryer length (m) | Type of process technology (e.g. electrostatic, calandering) | Type of controlled environment | Dew point (°C) | Further informations and specifications | Cell type | Max. cell size (Ah) | Max. number of cells per day (assembly) | No. of channels with < 10 A charging current | No. of channels with ≥ 10 A charging current | Type of controlled environment | Dew point (°C) | Further informations and specifications |
| - | - | wet | < 10 | < 200 | 1 to 9 | < 2 | Micro-environment | No dew point | Argon atmosphere | 2 to 29 | 10 to 49 | Micro-environment | No dew point | Argon atmosphere | |||||||